Fair
34°FFairFull Forecast

Reactor shut down at nuclear plant

Published: Friday, March 22, 2013 1:15 a.m. CDT

BYRON (AP) – Exelon Generation says it’s investigating a cooling pump malfunction that forced operators to shut down the Unit 2 reactor at the company’s Byron nuclear plant.

The reactor was shut down manually just before 8 p.m. Wednesday after the cooling pump malfunctioned on a generator that served the non-nuclear area of the Byron Generating Station, Exelon spokesman Neal Miller said.

The plant responded as expected, and the shutdown was performed safely, he said. The Unit 1 reactor continues to operate at full power.

Last year, an electrical insulator failed and fell off a metal structure, interrupting power to Unit 2 and causing the reactor to automatically shut down. The problem was fixed and the plant resumed operations the next week.

National video



Reader Poll

In the wake of heightened scrutiny of police departments in Baltimore, New York, and Ferguson over treatment of minorities, how do you rate the performance of your local police department?
Excellent
Good
Fair
Poor